Who we're talking to

Your roof comes off while you're still living there

That single fact makes loft conversions different from almost every other job we scaffold.

If you're a homeowner

You're converting the loft and staying put

Most people don't move out for a loft conversion. That means the roof gets opened up - sometimes substantially, for a dormer - above rooms you're still using. Rain getting in doesn't just delay the build, it damages ceilings and decoration that were never part of the job.

This is the job where a temporary roof system earns its cost most clearly. Ask about it early rather than after the first wet week.

If you're a loft specialist or builder

You need access for structure and dormer work

Loft work means steels going in, a dormer being framed, and often a large opening in the roof for days at a time. The scaffold needs to serve the roof plane rather than just the elevation, with somewhere to land materials that isn't the customer's garden.

Tell us the design - rear dormer, hip-to-gable, velux-only - because each one needs a different structure.

Request a quote for loft conversions scaffold

Tell us about the property and roughly when access is needed. Prefer to talk it through? Call 01223 756 576.

No obligation. We'll usually come back to you the same working day.

The jobs

Loft conversion types and what each needs

Rear dormer

The most common, and the most scaffold-heavy. A large section of rear roof comes off, so access across the whole rear elevation plus roof-level working platform, usually with temporary roof cover.

Hip-to-gable

The hip end is rebuilt as a gable wall, which means scaffold to the side elevation at full height plus brickwork access - closer to an extension than a roof job.

Velux or rooflight conversions

The lightest option. The roof stays largely intact, so access is usually a single elevation to roof level rather than a full wrap.

Mansard conversions

The most involved - the roof structure is substantially rebuilt, often on both sides. Long programme, significant scaffold, and temporary roof cover is normally essential.

Steel installation

Steels are craned or manhandled into the loft early in the job. Access and a landing point need planning before the structure goes up, not during.

Finishing and weatherproofing

Tiling, leadwork, guttering and render on the new dormer cheek - the same access needs as roofing work.

Cost

What drives the cost on a loft job

The conversion type does most of it. A velux conversion needs a fraction of the scaffold a rear dormer does, and a mansard more again. Beyond that it's the height of the property, whether both front and rear elevations need access, and rear access - a terrace with no side gate means everything is carried through the house or craned over, and that costs time.

The other big variable is temporary roof cover. It's an additional cost, and on a short velux job it may not be worth it. On a dormer or mansard running through autumn, it usually is - both for the programme and for what water does to the rooms below.

We scaffold loft conversions across Cambridge, Ely, Royston and the surrounding towns - see all areas we cover.

How we work

Working around a house that's still lived in

Access kept usable

Front doors, paths and bins still need to work for the weeks the scaffold is up - planned in, not worked around.

Cover before the roof opens

If a temporary roof is going on, it goes on before the roof is stripped rather than after the first forecast.

Struck once it's watertight

As soon as the dormer's finished and weathered, the access comes down and you get your garden back.

Questions

Loft conversion scaffolding, explained

For a rear dormer or mansard, usually yes - a large opening in the roof above rooms you're living in is a real risk, and water damage to ceilings below costs more than the cover does. For a velux-only conversion in settled weather, often not. We'll tell you which situation you're in.

Typically six to twelve weeks depending on the type and the builder's programme. Dormers and mansards sit at the longer end. It's a long hire, so agree the whole-job price rather than comparing weekly rates.

Yes, though it changes how the job runs - materials come through the house or over the roof, and that affects both time and cost. It's common on Cambridge terraces and it's one of the first things we look at on a site visit.

Partly, unavoidably - the structure needs somewhere to stand. What we can do is plan where it lands so paths, doors and as much of the garden as possible stay usable for what is often a couple of months of your life.